Procedures
SCUD Procedure CONST001 – Valve – Below Ground Valve Operation
SCUD Procedure CONST002 – Valve – Above Ground Valve Operation
SCUD Procedure CONST003 – Abandoning, Isolating and Deactivating Pipeline
SCUD Procedure CONST004 – Purging with Gas, Air, or Inert Gas
SCUD Procedure CONST005 – Pressure Testing of Facilities
SCUD Procedure CONST006 – Leak Test at Operating Pressure (Final Tie-in)
SCUD Procedure CONST007 – Excess Flow Valve (EFV) Installation
SCUD Procedure CONST007 – Excess Flow Valve (EFV) Installation updated
SCUD Procedure CONST007 – Excess Flow Valve_01_UMAC_1100
SCUD Procedure CONST007 – Excess Flow Valve_02_UMAC_Instructions
SCUD Procedure CONST008 – Joining of Plastic Pipe – Butt Fusion – Hydraulic
SCUD Procedure CONST009 – Joining of Plastic Pipe – Butt Fusion – Manual
SCUD Procedure CONST010 – Joining of Plastic Pipe – Electrofusion
SCUD Procedure CONST011 – Installation of Plastic Pipe in a Ditch
SCUD Procedure CONST012 – Installation of Plastic Pipe by Plowing
SCUD Procedure CONST013 – Installation of Steel Pipe in a Ditch
SCUD Procedure CONST014 – Backfilling
SCUD Procedure CONST015 – Excavation
SCUD Procedure CONST016 – Tapping and Stopping a Steel Pipe – Small Machine
SCUD Procedure CONST017 – Squeeze Off Plastic Pipe
SCUD Procedure EMER000 – Distribution System Emergency
SCUD Procedure EMER001 – Inside Gas Leak Investigation
SCUD Procedure EMER002 – Carbon Monoxide Leak Investigation
SCUD Procedure EMER003 – Blowing Gas Investigation
SCUD Procedure EMER004 – Outside Gas Leak Investigation
SCUD Procedure EMER005 – Driving Emergency Traffic
SCUD Procedure EMER006 – Emergency Turn Off & Turn On Service
SCUD Procedure EMER007 – Accident and Failure Investigation
SCUD Procedure EMER008 – Gas Supply Failure or Emergency
SCUD Procedure MAINT001 – Pipe to Soil Reading
SCUD Procedure MAINT002 – Inspect or Test Cathodic Protection Electrical Isolation Devices
SCUD Procedure MAINT003 – Install Cathodic Protection Electrical Isolation Devices
SCUD Procedure MAINT004 – Corrosion – Visual Inspection for Internal Corrosion
SCUD Procedure MAINT005 – Corrosion – Measurement of Internal Corrosion
SCUD Procedure MAINT006 – Corrosion – Visual Inspection for Atmospheric Corrosion
SCUD Procedure MAINT007 – Corrosion – Measurement of External and Atmospheric Corrosion
SCUD Procedure MAINT008 – Visual Inspection of New and Exposed Pipe & Components
SCUD Procedure MAINT009 – Leak Survey
SCUD Procedure MAINT010 – Inspect Pipeline Surface Conditions – Patrol Right-of-Way or Easement
SCUD Procedure MAINT011 – Valve – Above Ground Valve Corrective Maintenance
SCUD Procedure MAINT012 – Valve – Below Ground Valve Corrective Maintenance
SCUD Procedure MAINT013 – Valve – Above Ground Valve Annual Inspection-Operation-Maintenance
SCUD Procedure MAINT015 – Leak Grading Criteria
SCUD Procedure MAINT015 – Leak Grading Criteria – Copy
SCUD Procedure MAINT016 – Coating Application and Repair – Brush, Roll, or Wrap
SCUD Procedure MAINT017 – Install and Maintain Mechanical Electrical Connections
SCUD Procedure MAINT018 – Installation of Wire on Steel Pipe
SCUD Procedure MEAS001 – Odorization – Inspection, Testing, Preventive and Corrective Maintenance
SCUD Procedure MEAS002 – Odorization – Periodic Sampling
SCUD Procedure MEAS003 – Regulator Station Inspection & Maintenance