Procedures

Procedures

SCUD Procedure CONST001 – Valve – Below Ground Valve Operation

SCUD Procedure CONST002 – Valve – Above Ground Valve Operation

SCUD Procedure CONST003 – Abandoning, Isolating and Deactivating Pipeline

SCUD Procedure CONST004 – Purging with Gas, Air, or Inert Gas

SCUD Procedure CONST005 – Pressure Testing of Facilities

SCUD Procedure CONST006 – Leak Test at Operating Pressure (Final Tie-in)

SCUD Procedure CONST007 – Excess Flow Valve (EFV) Installation

SCUD Procedure CONST007 – Excess Flow Valve (EFV) Installation updated

SCUD Procedure CONST007 – Excess Flow Valve_01_UMAC_1100

SCUD Procedure CONST007 – Excess Flow Valve_02_UMAC_Instructions

SCUD Procedure CONST008 – Joining of Plastic Pipe – Butt Fusion – Hydraulic

SCUD Procedure CONST009 – Joining of Plastic Pipe – Butt Fusion – Manual

SCUD Procedure CONST010 – Joining of Plastic Pipe – Electrofusion

SCUD Procedure CONST011 – Installation of Plastic Pipe in a Ditch

SCUD Procedure CONST012 – Installation of Plastic Pipe by Plowing

SCUD Procedure CONST013 – Installation of Steel Pipe in a Ditch

SCUD Procedure CONST014 – Backfilling

SCUD Procedure CONST015 – Excavation

SCUD Procedure CONST016 – Tapping and Stopping a Steel Pipe – Small Machine

SCUD Procedure CONST017 – Squeeze Off Plastic Pipe

SCUD Procedure EMER000 – Distribution System Emergency

SCUD Procedure EMER001 – Inside Gas Leak Investigation

SCUD Procedure EMER002 – Carbon Monoxide Leak Investigation

SCUD Procedure EMER003 – Blowing Gas Investigation

SCUD Procedure EMER004 – Outside Gas Leak Investigation

SCUD Procedure EMER005 – Driving Emergency Traffic

SCUD Procedure EMER006 – Emergency Turn Off & Turn On Service

SCUD Procedure EMER007 – Accident and Failure Investigation

SCUD Procedure EMER008 – Gas Supply Failure or Emergency

SCUD Procedure MAINT001 – Pipe to Soil Reading

SCUD Procedure MAINT002 – Inspect or Test Cathodic Protection Electrical Isolation Devices

SCUD Procedure MAINT003 – Install Cathodic Protection Electrical Isolation Devices

SCUD Procedure MAINT004 – Corrosion – Visual Inspection for Internal Corrosion

SCUD Procedure MAINT005 – Corrosion – Measurement of Internal Corrosion

SCUD Procedure MAINT006 – Corrosion – Visual Inspection for Atmospheric Corrosion

SCUD Procedure MAINT007 – Corrosion – Measurement of External and Atmospheric Corrosion

SCUD Procedure MAINT008 – Visual Inspection of New and Exposed Pipe & Components

SCUD Procedure MAINT009 – Leak Survey

SCUD Procedure MAINT010 – Inspect Pipeline Surface Conditions – Patrol Right-of-Way or Easement

SCUD Procedure MAINT011 – Valve – Above Ground Valve Corrective Maintenance

SCUD Procedure MAINT012 – Valve – Below Ground Valve Corrective Maintenance

SCUD Procedure MAINT013 – Valve – Above Ground Valve Annual Inspection-Operation-Maintenance

SCUD Procedure MAINT014 – Valve – Below Ground Valve Annual Critical Valve Inspection, Operation & Maintenance

SCUD Procedure MAINT015 – Leak Grading Criteria

SCUD Procedure MAINT015 – Leak Grading Criteria – Copy

SCUD Procedure MAINT016 – Coating Application and Repair – Brush, Roll, or Wrap

SCUD Procedure MAINT017 – Install and Maintain Mechanical Electrical Connections

SCUD Procedure MAINT018 – Installation of Wire on Steel Pipe

SCUD Procedure MEAS001 – Odorization – Inspection, Testing, Preventive and Corrective Maintenance

SCUD Procedure MEAS002 – Odorization – Periodic Sampling

SCUD Procedure MEAS003 – Regulator Station Inspection & Maintenance

SCUD Procedure SERV001 – Customer Owned Piping

SCUD Procedure SAFE001 – Static Electricity Mitigation